One team from the lift core to the last finish.
Villa lifts, turnkey fit-out and interior design for homes and workplaces across the UAE, delivered under one contract.
Built as one
Most projects hire a lift company, a fit-out contractor and a designer, then spend months managing the gaps between them. We are all three, so the shaft, the finishes and the programme are decided together.
About Story and CoreServices
Lifts
Villa, passenger, glass and car lifts. Survey, supply, installation and modernisation.
Explore liftsFit-out
Turnkey fit-out for offices, retail, restaurants and residences, approvals included.
Explore fit-outDesign and interiors
Space planning, 3D visuals, materials, bespoke joinery and lighting.
Explore designLift maintenance
Annual maintenance contracts with scheduled visits and breakdown response.
Explore maintenance
Why one team
Shafts sized before the walls go up
Pit depth, headroom and shaft dimensions are fixed at design stage, so the lift fits the building rather than the building being cut to fit the lift.
Cabins that belong to the interior
Car walls, floors and lighting are specified in the same stone, timber and metal as the rooms they open onto.
One programme, one contract
Civil works, fit-out and lift installation run to a single schedule, with one team accountable for all of it.
Selected work
All projectsSample Sample Office floor, shell to handover
How a project runs
One project manager owns your programme from the first visit to handover.
Survey and brief
We measure the site, check the structure and agree scope, budget and timeline.
Design and approvals
Drawings, 3D views and lift layouts, followed by authority and community submissions.
Build and install
Civil works, fit-out and lift installation on one programme, with a written update every week.
Handover and care
Testing, certification and snag closure, then maintenance if you want it.
Journal
All articlesAdding a lift to an existing villa in Dubai: what to check first
Most villas can take a lift. Six site checks decide which type fits and how much building work it needs.
Hydraulic, MRL or platform lift: choosing a home lift
How the three common home lift types work, what each asks of the building, and how to choose between them.
Office fit-out approvals in Dubai: a plain guide
Which authority approves your fit-out, the documents usually requested, and where approval timelines slip.
Start with a site visit.
We measure, check the structure and give you a clear scope and budget before anything is signed.